Reroof Process

Our Re-Roofing Process

  • Step One - Complete Roof Tear-Off

    Remove existing roof and dispose of in onsite dump trucks. King Roofing does not use dumpsters or trailers.

  • Step Two - Replace All Rotted Plywood

    Inspect entire roof deck for rot and/or delamination. Plywood decking and other supporting wood that is unsuitable for new roof installation will be replaced.

  • Step Three - Re-Nail Entire Roof

    Nail entire roof deck using 8D ring shank nails attached 6" on center to meet current Florida Building Codes.

  • Step Four - Underlayment

    Secondary Water Resistance (SWR) Underlayment is applied to the entire roof deck.

  • Step Five - Installation

    Install custom fabricated 26ga Galvalume valley metal to all valleys. Install 26ga Galvalume drip edge metal to perimeter of roof surface. Boots and vents installed where necessary. Tile, Shingle, or Metal roofing material goes on the roof. 

  • Step Six - Final Inspection and Clean Up

    All debris is removed and magnets are used to pick up nails. A 5 year Workmanship Warranty is issued.

Call for a Free Quote

Serving Naples, FL since 1979

(239) 598-2414

(239) 598-2414
hibu-tm

"They were hard-working and cleaned up every day. Overall I’d highly recommend King Roofing."

- Joanne D via Google

Share by: